And now. The first target is 1.1340. The second target is 1,1540.
However there is the possibility of a correction in 1.1050
The result:
E.p = 1.1070
S.l = 1.1050
T1 = 1.1340 & T2 = 1.1540
However there is the possibility of a correction in 1.1050
The result:
E.p = 1.1070
S.l = 1.1050
T1 = 1.1340 & T2 = 1.1540